Solutions
Horse Construction business range tend to all over the world and service for thousands clients with products, technical,construction specialized guidance, and we witness the Chinese reinfocing brand's togther with them
Through the analysis of the actual situation of the bridge, it is found that the bridge belongs to a dangerous bridge. If it is not strengthened, collapse and other accidents may occur at any time in future use, which may cause huge economic losses and casualties.
General situation of Engineering
Yunzhuang River Bridge, a highway project around Jishou City on Provincial Highway $262, is built along the left side of Donghe River. The total length of the bridge is about 260.34 M. The superstructure of the bridge is 12m, and the width of the bridge is 4*15m+5*15m+6.5m,5X15m+6.5m and 3x15m. Through the analysis of the actual situation of the bridge, it is found that the bridge belongs to a dangerous bridge. If it is not strengthened, collapse and other accidents may occur at any time in future use, which may cause huge economic losses and casualties.
carbon fiber fabric for strengthening bridges
Reinforcement Design Scheme
(1) For the damaged concrete of the whole bridge, the exposed steel bars should be rusted off and repaired with epoxy mortar after rust removal.
(2) For concrete cracks in bridges whose width is less than O.15mm, crack edge sealant is used to seal the crack surface. In view of the concrete cracks on bridge deck exceeding 0.15mm, crack repair structural glue is used to seal the cracks by pressure grouting method.
(3) The bottom of box girder is strengthened by pasting fibre cloth.
(4) Seal the cracks in the whole deck pavement, and use epoxy resin cement to seal the cracks whose width is less than O.15mm. The crack width is more than 0.15mm, and the crack repair structure glue is used to repair the crack. After repairing, a DPS waterproof layer is coated on the bridge deck.
crack injection for bridge
In summary, the construction technology of long-span continuous bridge is a relatively complex work. However, in order to ensure the construction quality of long-span continuous bridges, in the specific construction process, we should fully grasp the key points and adopt scientific measures to improve the construction quality of long-span continuous bridges. Therefore, the construction plan should be designed scientifically, and the difficulties in the construction of long-span continuous bridges should be fully solved.
You can find anything here you are in need of, have a trust trying on these products, you will find the big difference after that.
Manuel dispenser gun
Imported high quaility
Specially designed for 390ml HM-500 injectable epoxy anchor adhesive.
Part A (Epoxy): 20kg
Part B(Hardener):10kg
Mix Ratio: Part A: Part B=2:1
Barrel A Size: 30*30*37cm
Bar
Part A (Epoxy): 15kg
Part B (Hardener): 5kg
Mix Ratio: Part A: Part B=3:1
Barrel A Size: 30*30*37cm
Barre