Horse Construction business range tend to all over the world and service for thousands clients with products, technical,construction specialized guidance, and we witness the Chinese reinfocing brand's togther with them.
According to the investigation data, the cause of structure cracking in engineering practice is about 80% of the cracks caused by "deformation" or cracks caused by "deformation" as the main factor, and about 20% of the cracks caused by the "load" factors.
1.Load
It includes self weight, vehicle load, crowd load, construction load, wind load, seismic load, water pressure, ice pressure, water buoyancy, soil pressure, and prestress.
2.Deformation
They include shrinkage, creep, hydration heat, environmental temperature changes, forced displacement (such as foundation or support displacement). The restraining effect and supporting friction effect between different parts of the same component.
According to the investigation data, the cause of structure cracking in engineering practice is about 80% of the cracks caused by “deformation” or cracks caused by “deformation” as the main factor, and about 20% of the cracks caused by the “load” factors.
In reinforced concrete structures, the strain of tension steel always exceeds the ultimate tensile strain of concrete, and cracks are inevitable. According to the durability requirements, when the width of the crack is less than 0.2mm, the steel bars are generally not corroded. Even if the cracks reach or slightly exceed the allowable value (0.2mm), the strength of the beams will not have obvious influence. When the cracks are large and the width is large, the stiffness of the beams will be reduced, and the reinforcement is eroded by harmful medium. Reinforcement must be carried out at this time, otherwise the service life of the bridge will be affected.
The usual methods for repairing cracks are crack repair, structural crack injection, externally bonded steel plate, externally bonded CFRP wrap, Pre-stressed FRP plate.
You can find anything here you are in need of, have a trust trying on these products, you will find the big difference after that.
Part A (Epoxy): 20kg
Part B (Hardener): 1kg
Mix Ratio: Part A: Part B=20:1
Barrel A Size: 30*30*37cm
Barre
Part A: Modified Epoxy (20kg)
Part B: Hardner(10kg)
Mix Ratio: A:B=2:1
Consumption Ratio: 0.2-0.3kg/sqm
Barrel A Size: 30*30
Part A (Epoxy): 20kg
Part B (Hardener): 10kg
Mix Ratio: Part A: Part B=2:1
Consumption Ratio: 0.6-0.9kg/sqm
See more >