Steel reinforcement-Jardine Matheson

strengthening Jardine Matheson with steel plate bonding and anchoring adhesive

reinforced Jardine Matheson

Project Name: the Bund No. 27 Jardine Matheson reconstruction project

Project introduction: new Jardine Matheson building was built in 1920, completed in November 1922. The building covers an area of 2100 square meters, construction area of 14300 square meters.

Project category: Civil Building

Project location: Shanghai, the Bund

Project time: July 2013

Project overview:the bearing capacity increases, the load increases, and the bearing capacity of the beam and column is strengthened

Engineering material:

 HM-500 anchoring adhesive

anchoring adhesive

HM-120 epoxy bonded steel plate

bonded steel plate

The products used in this case

People who browsed this project also concern these products: