The renovation project of kindergarten teaching building, with three-storey brick-concrete structure, has a building area of about 2800 m2. Because the original design was designed according to the old code, it is now checked in accordance with the current code and strengthened to those places that do not meet the current code. After strengthening, it is still used as a kindergarten teaching building, and the use function has not changed.
Rehabilitation and reinforcement of a kindergarten as a whole
The renovation project of kindergarten teaching building, with three-storey brick-concrete structure, has a building area of about 2800 m2. Because the original design was designed according to the old code, it is now checked in accordance with the current code and strengthened to those places that do not meet the current code. After strengthening, it is still used as a kindergarten teaching building, and the use function has not changed.
Because it does not meet the seismic requirements, the following treatment is carried out. The original brick wall uses concrete slab wall to increase the cross-section and enhance the overall seismic capacity.
You can find anything here you are in need of, have a trust trying on these products, you will find the big difference after that.
Part A(Epoxy): 20kg
Part B (Hardener): 10kg
Mix Ratio: Part A: Part B=2:1
Barrel A Size: 30*30*37cm
Barrel B
Volum: 75ML
Epoxy injctor is the tool to inject the epoxy into the crack.
Thickness:1.2mm, 1.4mm, 2.0mm, 3.0mm
Density: 1.6g/cm³
Packing: 100 meters/roll
Width: 50mm, 100mm or to be custo